Senior PLM Analyst

Formenergy

Where
Weirton, WV
Type
Full time

Posted 3 months ago· Checked live at Formenergy 3 hours ago

Stale: open 92 daysUp for more than two weeks. It may already be filled.

See how you score for this job

One sentence and your resume. We score it against what Formenergy asks for, line by line.

See my score
Is this job still open?
Yes. We checked it live on Formenergy's own hiring page 3 hours ago.
What is the job?
Are you ready to build America’s energy future? Form Energy is an American manufacturing and energy technology company. We’re revolutionizing energy storage with cost-effective, multi-day technology designed to keep the electric grid secure and reliable, even during extended periods of stress. By strengthening the electric system and reimagining what’s possible, we’re giving clean energy a whole new form!
What does it pay?
The posting doesn't say.
Our verdict
Stale. Up for more than two weeks. It may already be filled.

What the job is

Are you ready to build America’s energy future? Form Energy is an American manufacturing and energy technology company. We’re revolutionizing energy storage with cost-effective, multi-day technology designed to keep the electric grid secure and reliable, even during extended periods of stress. By strengthening the electric system and reimagining what’s possible, we’re giving clean energy a whole new form!

What you'll do

  • PIM Ownership: Serve as the primary functional owner for Oracle PIM within the manufacturing facility, ensuring data integrity and system alignment.
  • ECO & Effectivity Management: Coordinate closely with PLM administrators to manage Engineering Change Orders (ECOs) and meticulously manage effectivity dates within Oracle.
  • NPI Coordination: Partner with New Product Introduction (NPI) teams to determine optimal timing for making new design changes effective on the production floor.
  • Production Cut-Ins: Own and execute the process for cutting in new parts and revisions on active production lines with minimal disruption.
  • Configuration Control: Maintain and update highly accurate work order configuration documents to reflect the most current manufacturing bills of material (mBOMs).
  • Variance Analysis: Proactively analyze, troubleshoot, and resolve variances between PLM effective revisions and Oracle effective revisions to prevent build errors.