Test Floor Operator 2

HITACHI ENERGY USA INC

Where
Jefferson City, Missouri, United States of America
Type
Full time

Posted 10 days ago· Checked live at HITACHI ENERGY USA INC 4 days ago

Live.Open on the employer's own site.

See how you score for this job

One sentence and your resume. We score it against what HITACHI ENERGY USA INC asks for, line by line.

See my score
Is this job still open?
Yes. We checked it live on HITACHI ENERGY USA INC's own hiring page 4 days ago.
What is the job?
Jefferson City, Missouri, United States of America R0147593
What does it pay?
The posting doesn't say.
Our verdict
Live. Open on the employer's own site.

What the job is

Jefferson City, Missouri, United States of America

R0147593

2026-11-10

Production & Skilled Trades

Full time

No

Hitachi Energy is seeking a Test Floor Operator 2 for its Jefferson City, Missouri location. This role is responsible for testing of padmount distribution transformers, both single phase and three phase. Load and operate standard test equipment, load loss test facilities and breaker test equipment.

Responsibilities

  • Responsible for proper use and maintenance of required personal safety protective equipment and understanding proper hazardous material usage.
  • Check material/units to assure receipt and completion according to specifications.
  • Identify and report material irregularities and equipment malfunctions to appropriate personnel and/or department.
  • Receive or determine work assignments after schedules, production authorization, log books, overdue reports, or other appropriate information sources have been reviewed.
  • Keep work area clean, orderly and in safe condition.
  • Check unit data card.
  • Enter card and/or key, new or modified test data in operator console.
  • Perform the full range of tests such as; connection, demag, impulse, HLIC, LHIC,, iron loss, load loss, breaker test, temperature rise, sound, power factor, resistance, following procedures and engineering specifications.
  • Operate power conveyor to load transformer into test stations.
  • Determine by unit type the required bushing adapters and/or jumpers and install.
  • Load transformer into test stations using power transfer and connect overhead leads to transformer bushing adapters and/or jumpers to install.
  • Observe console and recognize and react to abnormal actions and alarms.
  • Perform remedial actions described by operating instructions and knowledge of the facility to resolve interruptions in the testing procedure.
  • Check pre-test steps, retest and/or make trouble check on units that fail any automatic test.
  • Notify supervisor of any unusual test conditions.
  • Disconnect leads from bushing at end of cycle.
  • Remove bushing adapters and tag unit if failed.
  • Record and/or initial processing data or test results according to prescribed procedures for defective test.
  • Unload transformer using power transfer or push to next station.
  • Set transformer aside on conveyor and notify appropriate personnel of any malfunctions or equipment irregularities.
  • Perform special tests including impulse, temperature rise, sound, copper loss, power factor, resistance, and iron loss on various sizes of distribution transformers using proper test equipment, booths, and generators.
  • Perform and/or assist in development of special tests requested and required by capacity, impulse, or overload and similar tests.
  • On non-standard hook-ups, work under engineering personnel direction, regarding instrumentation, power supplies, board connections or other special conditions.